BC-FS1-120V-03

Formlabs | Fuse Series Build Chamber 120V

$3,999.00

Minimize downtime by transferring modular build chambers and powder cartridges between Fuse 1 generation printers and the Fuse Sift, enabling a continuous workflow.

Each Fuse 1 generation printer includes one build chamber. Adding an extra chamber lets you start a new print immediately after the last job finishes. Once a print is complete, simply move the chamber to the Fuse Sift for cooling, part extraction, and material recovery.

  • Priority Delivery

    Typically ships within 1 week

  • After-Sale Service

    Email and Phone support

  • Product Details

  • Request Information

Compatibility

For the Fuse 1 generation printers (e.g., Fuse 1, Fuse 1+ 30 W) and the Fuse Sift powder-recovery system

Purpose / Function

Modular build chamber that allows printing jobs to be prepared or swapped out for continuous workflow — printing, cooling, part extraction, and build chamber reuse

Workflow-Benefit

Enables a cyclical, non-stop workflow: when one print finishes, the chamber is moved to post-processing while a new chamber begins in the printer — reducing downtime

Need more information?

We’re committed to providing expert insights and responsive service to guide you every step of the way. To get started, simply fill out the form below and we’ll be in touch shortly.

Need more information?

We’re committed to providing expert insights and responsive service to guide you every step of the way. To get started, simply fill out the form below and we’ll be in touch shortly.

Fuse Series Build Chamber 120V by Formlabs

Experience the Benefits

Continuous Production

Swap build chambers between the Fuse 1 printer and Fuse Sift to start new prints immediately, minimizing downtime and boosting throughput.

Durable, Ready-to-Reuse Design

Built for long-term use and consistent performance, the chamber withstands repeated heating cycles and powder reuse across multiple prints.

Seamless Integration

Designed to work perfectly with the Fuse 1 and Fuse 1+ 30 W systems, the modular chamber fits directly into the Fuse Sift for smooth, dust-free powder recovery.

Efficient Cooling and Post-Processing

Allow completed builds to cool in one chamber while another print begins, maintaining optimal productivity without delays.

For Fuse Series Build Chamber 120V by Formlabs

our featured products

find your answers here

frequently asked questions

Which printers is the Fuse Series Build Chamber 120V compatible with?

It works with the Fuse 1 generation SLS printers and the associated powder-recovery system (Fuse Sift).

Why would I need an extra Fuse Series Build Chamber 120V?

Having a second build chamber allows you to remove a completed build for cooling and powder recovery while another print starts immediately — reducing printer downtime.

How do I insert and remove a Fuse Series Build Chamber 120V correctly?

The chamber must be handled per instructions: unplug power, ensure no loose powder, align the plug and securely latch the chamber in place to avoid damage or detection issues.

What maintenance is required for the Fuse Series Build Chamber 120V?

Regular inspection is required: clean out powder residues, vacuum the chamber top, inspect the gasket and plug, and follow cleaning schedules for consistent print quality.

What happens if the Fuse Series Build Chamber 120V is not detected by the printer?

If the plug is dirty, damaged, or the firmware is outdated, the printer may fail to detect the chamber. Clean the plug, inspect pins, reboot the printer, and if needed contact support.